Download The Wellington App for more stories like this.

Slow down for Tawa to Porirua road works

NZTA advise that due to project road works there is a 70km/h temporary speed restriction in both directions on SH1 from Tawa to Porirua.

For southbound traffic there is a temporary road layout in place and an uneven road surface.

Road users are advised to adhere to the lowered speed limit and take care at all times.